Main content

News

AIDA Cruises: start of construction for the second LNG cruise ship at the Meyer Werft shipyard in Papenburg

Rostock, 15. August 2019

On August 15, 2019, the first steel cut took place at the Meyer Werft shipyard in Papenburg for the sister ship of AIDAnova, the world’s first cruise ship that is fully powered with low-emission liquefied natural gas (LNG). Just a few days ago, AIDA Cruises was awarded the Blue Angel, the German Federal Government’s ecolabel for AIDAnova’s environmentally friendly ship design. 

With the official start of construction for the second ship of this innovative AIDA ship generation to be put into service in spring 2021, the company is continuing its course and making a further contribution to reduced emissions in cruising. As early as 2023, the third LNG cruise ship of AIDA Cruises, “Made in Germany,” will set sail. Through the use of LNG emissions of particulate matter and sulfur oxides are almost completely eliminated, nitrogen oxide and CO2 emissions are sustainably reduced.

AIDA President Felix Eichhorn said, “By 2023, around half of all AIDA guests will be sailing on our state-of-the-art LNG ships that stand apart with many further technical innovations for greater efficiency, less fuel consumption and conserved resources.
At the same time, we are offering our guests on board our ships an extraordinary variety of individual vacation options, innovative entertainment and culinary concepts that provide lasting impulses to the vacation market in Germany.”

With an investment of around two billion euros just for the construction of both ships in Germany, the company is contributing to the economy and to the creation of secure jobs in the shipbuilding and maritime supply industry.

AIDA Cruises is also a trailblazer in many other areas that contribute to the energy transition. By the end of 2020, twelve of fourteen AIDA ships will be equipped for shoreside energy from renewable sources. Parallel to this, AIDA Cruise is currently exploring the use of fuel cells, batteries and liquefied gas from renewable sources in cruising. The company plans to test the first fuel cell unit on board an AIDA vessel in 2021.


Technical data:
Shipyard: Meyer Werft, Papenburg (Germany)
First steel cut: August 15, 2019
Commissioning: Spring 2021
Length: 337 meters
Width: 42 meters
Max. draft: 8.80 m
Gross tonnage: 183,900 GT
Decks:    20
Number of staterooms: 2,600
Crew: approx. 1,500

amenue
11. March 2013

AIDA Cruises 2015: from Japan to Germany in 86 days

A voyage from “the Land of the Rising Sun” to the Occident – what sounds like a fairy tale is, in fact, the maiden voyage of AIDA Cruises’ new generation of ships. The company is publishing information about the 86-day voyage of the new AIDA vessel from March 22 to June 16, 2015 ... [more]

11. March 2013

AIDA Cruises takes delivery of new ship

On March 11, 2013, AIDA Cruises finally took delivery of its new ship, AIDAstella, from the Meyer Werft shipyard in Papenburg at a special ceremony. The vessel was handed over to the cruise operator in the presence of Michael Ungerer, President of AIDA Cruises, and Bernard ... [more]

01. March 2013

AIDA Cruises grows more quickly than the overall market once again in 2012

AIDA Cruises, the leading cruise operator in Germany, once again grew more strongly than the cruise market as a whole last year. “Despite the difficult market environment at the beginning of the year, we are experiencing continued interest in cruise vacations with AIDA”, says ... [more]