Main content

News

AIDAnova: First engine room module on Neptune shipyard finished

Rostock, 21. September 2017

oday, Thursday, September 21, 2017, an AIDAnova module has been released into the water for the first time at the Neptun shipyard in Rostock, which belongs to the Meyer Group. This is the first of two floating parts, so-called Floating Engine Room Units (FERU), which was placed onto the Warnow river with a special lowering device. The complex module stretching over 120 meters long and 42 meters wide, as well as three decks high, is carrying the four dual-fuel engines by Caterpillar and hence the heart of AIDAnova.

AIDAnova is the first cruise ship in the world, which – starting in the fall of 2018 – will be able to operate both in ports and at sea with the most environmentally friendly and lowest-emission fossil fuel thanks to the operation of four dual-fuel engines. By using LNG, emissions of fine dust and sulfur oxides are almost completely prevented and emissions of nitrogen oxides and CO2 are permanently reduced.

The shipment of the first AIDAnova module from Rostock to the Meyer Werft shipyard in Papenburg is scheduled to take place from September 25–28, 2017, depending on the weather conditions. It’s time to set sail as planned next Monday, September 25, 2017, at 10.00 am at the Neptun shipyard in Rostock with a course set for the Kiel Fjord. In the early morning hours of September 26, 2017, around 7.00 am, the floating part will begin the passage through the Kiel Canal from Kiel to Brunsbüttel. After a twelve-hour journey, the floating module will arrive in Brunsbüttel on September 26, 2017, at around 7 pm. From Borkum, it will carry on towards Emden with an expected arrival time of 9.00 am on September 27, 2017. The last passage will take the part from Emden to Papenburg, where the four dual-fuel engines will arrive around 7 pm on September 28, 2017.

With the construction of the engine room modules at the Neptun shipyard in Rostock and the investment in Caterpillar engines, AIDA Cruises not only strengthens regional cooperation but is also a key driver of the local economy. More than 500 shipyard workers and 500 external employees from other service providers are currently employed at the Neptun shipyard. In addition, there are 120 Caterpillar employees, who are assembling the engines.

Bookings are now available
Starting in December 2018, AIDAnova will offer trips around the Canary Islands. Before the start of the Canary season, the new ship will make a stop in Hamburg. On December 2, 2018, the new ship will visit the Hanseatic City on the Elbe. From here, it will set off towards Gran Canaria.

All AIDAnova cruises can be booked at travel agencies, the AIDA Customer Center at +49 (0)381/202 707 07 or at www.aida.de. More information and impressions are available at aida.de/genaumeurlaub.

amenue
29. October 2018

AIDA Cruises awarded the German Fairness Award for the fifth time in a row

The cruise company AIDA Cruises has once more received the German Fairness Award 2018. In cooperation with the n-tv news station, the German Institute for Service Quality conducted a comprehensive survey among more than 50,000 consumers on the topic of fairness with regard to ... [more]

24. October 2018

PM AIDAnova fueled with liquefied natural gas for the first time

On October 18, 2018, the new AIDAnova became the first cruise ship in the world to be fueled with liquefied natural gas (LNG). In Eemshaven in the Netherlands, the tanker “Cardissa” filled the three special tanks with a total of around 3,500 cubic meters of LNG.Two of the tanks ... [more]

24. October 2018

AIDA among Germany’s best training companies

For the second time in a row, business magazine Capital, together with the talent platform Ausbildung.de and Territory Embrace, has named the "Best Training Companies in Germany". The cruise company AIDA Cruises convinced in the fields of “combined vocational training ... [more]